|
![]() |
Instruction of manufacture process: |
![]() |
Before materials are put into the furnace for melting, they will be classified carefully. |
![]() |
|
![]() |
During melting, several times analysis and inspection will be made to assure the quality of aluminum liquid. |
![]() |
|
![]() |
After the aluminum liquids meet the standard, cooling for a moment then cast into aluminum ingots. |
![]() |
|
![]() |
Automatic process will be executed after casting into aluminum ingots, they are: molding, cooling, weighing, packing and tagging. After this, aluminum alloy ingots are ready to deliver to our clients. |
![]() |
Flow chart of Production: |
![]() |
![]() |
Equipment & Capacity: |
Melting Equipment: |
Melting Equipment: |
||||||||||
|
|
||||||||||
|
![]() |
品質檢測設備: |
![]() |
|||||||
|
||||||||
Suction System: |
||||||||
|
![]() |
Automatic aluminum alloy molted and casted equipment: |
|
|
|
|
|
![]() |